INDUSTRIAL & REFRIGERATED
STORAGE
|
|
|
|
|
Douglas County Forestry Gordon, WI
CLICK ON PROJECT PICTURE
FOR MORE INFORMATION.
|
|
|
|
|
|
Great Lakes Renewable Energy Hayward, WI
CLICK ON PROJECT PICTURE
FOR MORE INFORMATION.
|
|
|
|
Project:
Location: Total
Sq. Ft.: Construction: Facility Use: Project Info:
|
|
Liquid Waste Technology New Richmond, WI 82,000 Pre-Engineered Steel & Masonry Factory/Assembly We design/built the original facility and
have since built a 37,500 s.f. addition. This facility for Liquid Waste Techonolgy is a mixture
of pre-engineered and conventional steel, masonry and precast construction.
|
|
|
|
Project:
Location: Total Sq. Ft.: Construction: Facility Use: Project Info:
|
|
Rice Lake Weighing Systems, Inc. Rice Lake, WI 184,800 Pre-Engineered Steel Manufacturing
& Office Northwest Builders, Inc., was selected to build the first building for Rice
Lake Weighing in 1973. Since then, we have completed 11 additions and have done a number of interior remodeling
projects.
|
|
|
|
Project: Location: Total Sq. Ft.: Construction:
Facility Use: Project Info:
|
|
Burns Best Spooner, WI 27,200 Pre-Cast
Concrete & Conventional Steel Manufacturing & Office When we were awarded
the contract from Burns Best, we worked very closely with the owner to point out alternative materials and systems to save
costs. The construction very challenging due to the tight project schedule. The building permit required us to
design the site and drainage plan in-house as well as obtain WisDNR erosion control approval. The pre-cast walls
and steel erection were placed in November and slab work was done during the winter months. The interior build out and
finishes were completed by the end of February, well ahead of a spring opening. The project was a huge success completed
below budget and ahead of schedule.
|
|
|
|
Project: Location: Total Sq. Ft.: Construction: Facility Use: Project Info:
|
|
Spooner Machine Spooner, WI 12,150 Pre-Engineered Steel Manufacturing
& Office This project was performed on a design-build basis. Spooner Machine, Inc., required a large clear space
for steel fabrication and minimal office area. The project budget was very tight and time was of the essence. The clear span
also required the steel to be sized for the future installation of an under-slung overhead bridge crane. We designed a pre-engineered
structure to fit within all of Spooner Machine's requirements. We worked very closely with the City of Spooner in preparing
the site and obtaining the proper permitting. The project was completed well within schedule and on budget. The owner of Spooner
Machine, Inc., has recommended us for numerous projects in the area since the completion of his facility.
|
|
|
|
Project: Location: Total Sq. Ft.: Construction: Facility Use: Project Info:
|
|
Lawrence National Lease Barron, WI 7,500 Pre-Engineered Steel Vehicle
Repair & Office Lawrence National Lease chose us for this design-build project to give them a local presence. We
worked with the City of Barron to obtain all plan approvals and permitting. The building structure is all Butler pre-engineered
steel with MR24 roof and SHADOWAL panel. The interior areas of the building consist of 1,500 s.f. office area with
mezzanine above and 6,000 s.f. of vehicle repair garage. This project was completed well ahead of schedule and within budget.
|
|
|
|
Project: Location: Total Sq. Ft.: Construction:
Facility Use: Project Info:
|
|
Cedar Crest Ice Cream Rice Lake, WI 8,400 Pre-Engineered
& Conventional Steel Freezer / Terminal / Office We were chosen by Cedar Crest Ice Cream to design and build
a new distribution terminal for them in the City of Rice Lake. The final design consisted of 2,400 s.f. of 0º freezer,
3,600 s.f. of vehicle storage, 2,400 s.f. of mezzanine and 2,400 s.f. of office space. Construction for this project took
place during the winter months and was very challenging cold weather concrete work. The project was very successful both in
design and construction. Cedar Crest Ice Cream continues to be a very good reference for us.
|
|
|